Sambalpur(NTP):
Mr Bhola Nath Shukla, Chairman-cum-Managing Director (CMD), Mahanadi Coalfields Limited (MCL) today said that Coal India would achieve coal production of 300 million tonne per annum by financial year 2026 with long term planning and inclusion of new technologies for coal excavation and despatch.
“We are into a long term planning to ensure that mining operations remain smooth to register consistent growth. By 2025-26, we expect company to achieve 300 million tonne figure, with 200 million tonne produced by Talcher coalfields alone” said Mr Shukla, while interacting with media persons during his maiden visit to Talcher coalfields.
Mr Shukla was the Director (Technical) of Central Mining Planning and Design Institute Limited (CMPDI) before taking up charge of CMD, MCL on 14th of this month.
Asserting that the company has taken major initiative to enhance coal evacuation through infrastructure development, like coal corridor, SILOs, etc, the CMD said focus would be on speedy capacity enhancement of rail infrastructure, which would also help private players develop their coal blocks and contribute towards meeting the growing energy demand of the nation.
The company is going ahead with environment-friendly initiatives like pipe conveyors, coal washeries, SILOs, belt conveyor etc. to ensure sustainable mining operations.
